a 300 sq ft slab at 4 in thick needs 3.11 m³ (4.07 yd³) of concrete with 10% extra — or the bag counts in the table. The exact order quantities for a 300 sq ft pour — ready-mix volume and pre-mix bags, computed with the same yields as the site's Concrete Calculator.
| Slab area | 300 sq ft (27.9 m²) |
|---|---|
| Thickness | 4 in (102 mm) |
| Exact concrete volume | 2.83 m³ (3.70 yd³) |
| Volume incl. 10% extra | 3.11 m³ (4.07 yd³) |
| Pre-mix bags — 80 lb bag | 184 bags |
| Pre-mix bags — 60 lb bag | 245 bags |
| Pre-mix bags — 25 kg bag | 271 bags |
| Pre-mix bags — 20 kg bag | 339 bags |
The figures use exactly the Loona Concrete Calculator's model — volume = area × thickness, bags at the manufacturers' standard yields (an 80 lb bag makes ≈0.017 m³ / 0.6 ft³). For a different thickness or waste allowance, the Concrete Calculator recomputes instantly.
Suppliers sell by the cubic yard/metre and round to their minimum load. For 300 sq ft you order 4.07 yd³ — call it 4.5 yd³ with most suppliers' half-yard rounding, and confirm the short-load fee before the truck rolls. Bagging this slab instead means 184 80-lb bags — beyond about 1 yd³, ready-mix is almost always cheaper and always faster.
Concrete Calculator · Brick Calculator · Tile Calculator · Paint Calculator · Roof Pitch Calculator · Deck Calculator
At 4 inches thick: 2.83 m³ exact, 3.11 m³ (4.07 yd³) with the customary 10% extra for spillage, uneven subgrade and over-excavation.
Multiply every volume and bag figure here by 1.5 — volume scales linearly with thickness. The Concrete Calculator handles any thickness directly.
This page lists both. As a rule of thumb, under ~0.5 yd³ bags are convenient; at 4.1 yd³ a truck is the sane choice for most people.
Only through thickness and waste. Volume is area × thickness whatever the shape — irregular shapes just deserve the full 10% extra.
The headline result on this page — a 300 sq ft slab at 4 in thick needs 3.11 m³ (4.07 yd³) of concrete with 10% extra — is the number to plan and order with. Order ready-mix by the volume shown — suppliers round up to their nearest load size — or buy the bag count from the table if you are mixing on site. Keep the 10% extra in the order: it covers spillage, uneven ground and slight over-excavation, and running short mid-pour costs far more than one spare bag.