Loona Construction Calculators
Loona Construction Calculators › Construction › Materials for a 10 × 12 ft Shed Base

Materials for a 10 × 12 ft Shed Base

the complete, computed materials list for this project — concrete first, then the base and steel that make it last. Project pages answer the question calculators can't: 'what do I actually buy?' — every quantity below is computed with the site's own calculator models.

The concrete order

Slab area120 sq ft (11.1 m²)
Thickness4 in (102 mm)
Exact concrete volume1.13 m³ (1.48 yd³)
Volume incl. 10% extra1.25 m³ (1.63 yd³)
Pre-mix bags — 80 lb bag74 bags
Pre-mix bags — 60 lb bag98 bags
Pre-mix bags — 25 kg bag109 bags
Pre-mix bags — 20 kg bag136 bags

A 10 × 12 ft, 4-inch slab is the classic shed base. Small enough to bag-mix in a day (the 80-lb bag count is in the table), big enough to matter if it's unlevel — take the extra hour on the formwork. Gravel base ≈ 1.5 yd³, plus one 120 sq ft vapour sheet.

All quantities computed with the Concrete Calculator's model (manufacturers' bag yields, volume incl. 10% extra), checked 9 November 2026. Prices vary too much by region to quote honestly — take this list to your supplier for local rates.

Popular Construction Calculators

Concrete Calculator · Brick Calculator · Tile Calculator · Paint Calculator · Roof Pitch Calculator · Deck Calculator

Frequently Asked Questions

How thick should the slab be?

4 inches for cars and sheds; 5–6 inches for heavy vehicles, RVs or where the slab meets the street. Thickness changes every number linearly — the Concrete Calculator adjusts in one step.

Do I really need the gravel base?

On any soil that isn't already compacted rock: yes. 4 inches of compacted gravel stops the slab cracking from soft spots and gives drainage. It is the cheapest insurance in the whole project.

Bags or ready-mix for this size?

The table lists both. This pour is 1.25 m³ with extra included — past roughly 1 yd³, a truck wins on cost and on finishing time before the concrete sets.

What about reinforcement?

A single layer of welded wire mesh (or #3/#4 rebar on an 18–24 in grid) held at mid-slab on chairs. Fibre mesh in the mix is a supplement, not a substitute, at these sizes.

How to use this figure

The headline result on this page — the complete, computed materials list for this project — is the number to plan and order with. Work down the table line by line when you order: the list already counts the easy-to-forget items, so buy each line as printed rather than estimating from the headline item alone, and round each line up to your supplier's full packs, bags or lengths.

Related

🧱

Concrete Calculator

Recompute for your exact size.